Result description
Demonstrated 120 hours of pure hydrogen production (99.99%) from biomass waste (shells) at 1 MWth biomass input plant size!!!
Addressing target audiences and expressing needs
- To raise awareness and possibly influence policy
- Grants and Subsidies
Realise waste biomass to pure hydrogen plant taking into account the UNIfHY experience
- Public or private funding institutions
- EU and Member State Policy-makers
- Private Investors
R&D, Technology and Innovation aspects
The plant has been built and better plants (that take care of some issues arisen as too much tar, too much methane and CO2 to reach very high efficiency and realibility) are designed and can be built (as the ones developped in the subsequent BLAZE and GICO projects)
The plant can be built from few hundreds kWth to multi MWth of biomass input
The plant can be applied to any “good” lignocellulosic biomass waste (lower is the ashes, tar and contaminants content and higher is the calorif value better is )
In order to be sustainable plant capital and operational cost have to be decreased meanwhile releabiliity (for tar and contaminants) have to be improved

